Wang Cheng and Liu, Xiao bing and Zhao, Guo zhi and Chin, Kim On (2016) Multi-objective integrated production planning model and simulation constrained doubly by resources and materials. International Journal of Simulation Modelling, 13 (2). pp. 243-254. ISSN 1726-4529
|
Text
Multi objective integrated production planning model and simulation constrained doubly by resources and materials.pdf Download (90kB) | Preview |
Abstract
Based on analysing the defects of ERP planning system and researching related literatures, a multi objective integrated production planning model is constructed which is constrained double by resources and materials. The model tekes delivery on-tome, reduces inventory , reduces overtime work, meintains safety inventory as its optimization objectives, and can achieve the integrated optimization method provided by the model has strong feasibility and effectness.
Item Type: | Article |
---|---|
Keyword: | Integrated Production Planning, Multi-Objectives Optimization , optimization model , resources , materials , simulation |
Subjects: | ?? QA75 ?? |
Department: | FACULTY > Faculty of Computing and Informatics |
Depositing User: | NORAINI LABUK - |
Date Deposited: | 07 Aug 2018 15:14 |
Last Modified: | 07 Aug 2018 15:14 |
URI: | https://eprints.ums.edu.my/id/eprint/20591 |
Actions (login required)
View Item |