Element of v-model in Construction project

Noor Idayu Mohd Azmi (2022) Element of v-model in Construction project. Universiti Malaysia Sabah. (Unpublished)

[img] Text
24 PAGES.pdf

Download (659kB)
[img] Text
FULLTEXT.pdf
Restricted to Registered users only

Download (3MB)

Abstract

This study explains the element of Software Development Lifecycle (SDLC) model which is V-model in details, regarding its application in software development industry, the advantages, and disadvantages of this specified model, and the application of this model towards the construction industry project management model specifically in Sabah. Before the application is analysed, the first thing to be determined is the similarity and the elements included in the model and in typical construction projects. There are three objectives that included in this study which are to describe the V model principle to distinguish the elements of V model in construction project in Sabah, and to analyze the applications of V model in construction project in Sabah. This study focuses on the implementation into the construction industry in Sabah with some discussions about to the project delays factor that might be related to the application of V-Model, or any foreseen impact if V-Model is applied. The methodology used in this study is qualitative method, by doing secondary research and data collecting from previous studies, and document analysis from Sabah’s construction project documents from Jabatan Kerja Raya (JKR) Malaysia. There are three construction projects that has been analyzed which are the Cadangan Pembinaan Kolam Renang, Balai Bomba dan Kuarters Kimanis and Cadangan Pembinaan Hospital (76 Katil). The elements of V-Model used in all three projects were specified, and the application of V-Model also has been analyzed throughout this research. The limitations of this research are time and also not many open resources available for the application of V-Model in construction projects. Further recommendations and suggestions are also specified in the final chapter of this study, to be used for the future study of the same field.

Item Type: Academic Exercise
Keyword: V-model , Construction project , Software development lifecycle
Subjects: T Technology > TH Building construction > TH1-9745 Building construction
Department: FACULTY > Faculty of Engineering
Depositing User: DG MASNIAH AHMAD -
Date Deposited: 15 Mar 2023 10:45
Last Modified: 15 Mar 2023 10:45
URI: https://eprints.ums.edu.my/id/eprint/35216

Actions (login required)

View Item View Item