Lau, Meng Yong (2006) Computer aided project management case studies in Sabah and Kelantan. University Malaysia Sabah. (Unpublished)
|
Text
ae0000002267.pdf Download (2MB) | Preview |
Abstract
The construction process is generally divided into three major phases, the project conception, project design and project construction phase. In each of the phases involved different tasks by different group of project participants. Sum as client, consultants, contractors and supplier who are often new to each project. 'The thesis studies how software is integrated in today construction project management. This research covers the method of project management and influences on the application of project management software such as Primavera and Microsoft Project Management. The research area is around Kota Kinabalu, Sabah and Aring, Kelantan for the case studies :- 1. "2 '½ Stories House in Kingfisher, Kota Kinabalu, Sabah" by using KA 3753 Contract and Estimation assignment. 2. "Road Project -Simpang Pulai - Lojing - Gua Musang - Kuala Berang Package 6 (From Aring to Jambatan Pasir Pulau)" by Kumpulan Liziz Sdn. Bhd.In the research period, the efficiency of the computer aided work is discussed. Various scenarios is simulated in this thesis to discuss the problems occur on site and how is the problem rectify in order to ensure the project stay within the planning schedule. A survey is conducted during the research period to gain more information from various project managers in order to identify what type of software and method used in the respective project.
Item Type: | Academic Exercise |
---|---|
Keyword: | computer, project management, project design, participant, Primavera, software |
Subjects: | Q Science > QA Mathematics |
Department: | SCHOOL > School of Science and Technology |
Depositing User: | SITI AZIZAH BINTI IDRIS - |
Date Deposited: | 26 May 2014 09:18 |
Last Modified: | 13 Oct 2017 12:23 |
URI: | https://eprints.ums.edu.my/id/eprint/9098 |
Actions (login required)
View Item |